Project
|
Description of Work
|
|
Hire experienced and qualified maintenance staff. |
Our maintenance staff is trained and provided with the right
tools and resources to get the job done. If we do not self perform the
work, we outsource to the best professionals in the business to make sure
your apartment is kept in top condition. |
|
Computerize accounting systems |
The manual accounting systems were replaced with computerized Yardi Property
Management, the industry standard utilized by small and huge management
companies worldwide. Additionally, Parkview was connected via T1
circuit to the main office and the internet. |
|
Renovate office |
The office was renovated to provide an enhanced work environment for our
manager as well as a more comfortable place for our residents to conduct
business with us. |
|
Re-Key Apartments |
The apartment locks were re-keyed to improve safety.
Defective locks were changed. |
|
Re-plaster swimming pool & spa |
The pool and spa were in very bad condition at the time of purchase.
Our plasterer, Bob Chandler, applied the finest pool surfacing product,
Pebble Sheen, to provide a long lasting surface to the pool and spa. |
|
Major Tree and Shrub trimming |
The property was overgrown at the time of purchase with many plants in
contact with the buildings. All shrubs were pruned away from buildings
and shaped. |
|
Upgrade exterior lighting |
The exterior lighting was in poor repair, and areas were improperly lit.
Our electrical contractor has repaired all exterior lights in the parking
areas. |
|
Fence installed on North property line |
The northerly property line adjacent to Chico Canyon Road was fenced with a
cedar fence to provide an aesthetic backdrop and to provide privacy and
noise screening for the adjacent residents. |
|
Improve landscape adjacent to new fence |
The new fence has created areas that have great potential, and our
landscaping contractor will be improving the irrigation and plantings in
these areas. |
|
Improve lighting on some buildings |
Some of our buildings have poor pathway lighting, and this situation is
being addressed by installing pathway lighting |
|
Parking Lot structural repairs |
The original parking lot was not built using best industry practices and the
gutters have failed in many areas. These areas are being rebuilt to
include concrete gutter pans in areas where peak drainage flows occur.
Structural defects, damage, and wear are also being addressed. This
project will provide a more durable surface that will drain properly and not
deteriorate as quickly as the original lot. |
|
Repaint entire exterior
of complex |
We are in the process of collecting bids to repaint the entire exterior of
the property. We will be using a high grade elastomeric / latex hybrid
paint system developed by Kelly Moore Paint Company. Ron, our
Maintenance Supervisor, will be making sure the work is done properly. |
|
Repair Sidewalks |
The property had significant heaving of the sidewalks and
curbs. This was repaired throughout the site to improve appearance and
safety. |
|
Install Ceiling Fans in
Bedrooms |
Beginning in Summer, 2003, ceiling fans are installed in
bedrooms and dining rooms to enhance the property and save energy. |
|
Paint parking canopies |
The parking canopies was painted to match the building body
color. |
|
Improve website to
provide online work order submittal. |
Work orders can now be submitted by phone or fax, in person,
in writing to the drop box or online. It is our business philosophy
that people communicate in many ways, and we strive to accommodate people's
preference. |
|
Renumber Canopies |
Parking canopies were re-numbered in a way where the number
is not related to the apartment. This was a security enhancement. |
|
Construct Clubhouse &
Workout Room - August 2004 |
Absolutely state-of-the-art clubhouse. A fitness center
with club grade equipment. A clubhouse complete with surround sound
plasma entertainment center, a kitchen and buffet center - absolutely
gorgeous. |
|
Stripe Parking Lot
(where necessary) |
The parking lot, where repairs have been made, will be
striped as necessary. We will also be removing unused handicapped
stalls and adding fire lane markers to enhance public safety. |
|
Provide Storage
Facilities for Parts and Supplies |
A storage container and a fenced area was added so that
supplies can be kept on-hand resulting is a higher service level to our
residents. |
|
Upgrade Landscaping by
Pool and Clubhouse |
The beautiful Palm Trees were professionally trimmed.
Then, all planted areas were re-planted with tropical plants and the use of
decomposed granite. The area now has a tropical theme. It looks
great. |
|
Paint exterior doors of
units |
Exterior entry doors were painted and custom decals were
added to improve the entries to the apartments. |
|
Install curbs at entries |
Curbs were installed at the entry areas of the property to
provide a more finished look to this important area. |
|
Light Main Sign |
The main sign adjacent to the rock wall on California Park
Drive was lighted to make it easier to find the community at night. |
|
Upgrade computer systems
to provide online bill payments. |
The website was upgraded to provide online bill payment
capabilities. |